Thorson Baker + Associates - Consulting Engineers
,

Akron Children’s Hospital Kay Jewelers Pavilion: Critical Care Tower

The $178,000,000 project consists of a 240,000 SF medical office building, new central atrium and 100,000 SF critical care NICU, and will serve as a child-focused patient and visitor welcome center that will streamline access to the campus.


Akron Northside Condominium Loft Buildings

A 10-story, 75,000 SF loft building above a 3-story, 51-space enclosed parking garage.


Akron Public Schools National Inventors Hall of Fame School
Center for Science, Technology, Engineering and Mathematics (STEM) Learning

Five-story 50,000 SF school addition to the Inventors Hall of Fame on a very restricted urban site.


Akron Zoological Park Various Projects

TBA has been providing Civil Engineering, Landscape Architecture, Structural, Mechanical, and Electrical Engineering design services to the Akron Zoo for the past 17 years.


Akron-Summit County Public Library Main Library Additions and Renovations

Two additions to the existing main library including a three-story 135,000 SF addition with an 800-seat auditorium.


Aultman Hospital System Aultman 2010

Four-story 321,000 SF hospital addition connected to an existing facility by a new four-story atrium and corridor connection at each level with a roof top heliport.


Barberton City School District Multiple Projects

15,000 SF addition to the existing U.L. Light Middle School and renovation of 67,000 SF of existing space converting the building to a new elementary school.


Case Western Reserve University Leutner Hall Renovation and Addition

The renovation and addition transformed the 1965 space into a contemporary, inviting and flexible dining, studying and social center with lecture and seminar meeting capabilities.


Cleveland State University Student Center and Plaza

The new student center includes a main food service kitchen and dining area, bookstore, conference center, student life administration offices, and space for student organizations.


Cleveland State University Multiple Projects

The new student housing complex consists of four 4-story structures and includes retail, admissions, commons area and dormitory (548 beds) for a total of 229,096 SF.


Crocker Park Lifestyle and Mixed Use Development

The retail component includes over 100 of the nation’s top retailers and over 30 restaurants.


Cuyahoga Community College Hospitality Management Center

25,000 SF renovation and re-purpose of the existing first floor of the former May Company department store (built circa 1908) near Public Square in downtown Cleveland for the Tri-C Hospitality Management Center.


Cuyahoga Community College Recreation Wellness Center Expansion

Renovation of the 26,000 SF facility included infill of existing racquetball courts to create 10,000 SF of new two story space for exercise and fitness programs.


Elyria City School District Elyria High School

The new two-story 253,000 SF Elyria High School was designed to LEED standards constructed adjacent to the existing historic 1894 Washington Building.


Fisher-Titus Medical Center Multiple Projects

One-story 11,750 SF addition and renovation of 20,150 SF of the existing one-story medical facility for oncology and rehabilitation.


Head Start at Windermere CEOGC George Forbes Head Start

One-story 25,000 SF educational facility designed to serve 300 underprivileged children from six weeks to three years old and traditional Head Start preschool-aged children.


Icon in the Gulch Multi-Use Project

Multi-use 20-story project consisting of an eight level 849-space, 337,800 SF parking structure, supporting a twelvestory 200-unit 210,500 SF condominium tower.


Keystone Local School District Multiple Projects

Stark State College of Technology Various Projects

The $8,400,000, two-story 43,174 SF addition to the Health Sciences Building contains laboratories, classrooms, and staff offices.


The Flats East Bank Block 7

The Flats East Mixed Use Development Project is located on the waterfront, directly in the heart of the East Bank.


The Horseshoe Casino Historic Higbee Building

TBA provided structural engineering services for the modifications to the existing 300,000 SF Higbee Building to be renovated into the Horseshoe Casino.


The Ohio State University Chemical & Biomolecular Engineering and Chemistry (CBEC)

This 225,000 SF project relied heavily on building information modeling, as well as sustainable design, complying with requirements for LEED silver.


Wadsworth City Schools Multiple Projects

TBA provided MEP and technology design for 3 new elementary schools - Isham, Overlook and Valley View.